Xiaoshan Water Division: Flowmeter monitoring starts from the normative process

Among the numerous metrology TOOLS, large-diameter remote water meters and flow meters can realize no-person meter reading or non-contact meter reading, and can automatically count water consumption, master user water usage rules, track water meter operation conditions, and implement it through a management system. Data collection, monitoring and analysis. Therefore, it is of great significance to monitor large-diameter remote water meters and flow meters in the daily water metering work.

Hangzhou Xiaoshan Water Supply Company attached great importance to the monitoring of large-caliber remote water meters and flowmeters. The Water Division required the staff to strictly perform the monitoring work according to the "Hangzhou Xiaoshan Water Supply Co., Ltd. Business Measures for Measurement and Management Measures" and related rules and regulations, through various departments. The cooperation establishes a set of standardized management processes. The process consists of the following seven major components:

1. The designated personnel pay close attention to the operation of large-caliber remote water meters and flowmeters in the production dispatch system, and make daily records.

Second, carefully analyze the relevant data to check if there is any abnormality in the remote water meter or flow meter flow. Each business office submits a remote monitoring flow meter water analysis table to the Water Supply Supervision Section every week.

Third, if there is an abnormality, timely record the time when the abnormality was found, find the initial time when the abnormality occurred, and at the same time send the staff to the scene to see the actual situation at the first time.

4. During the on-site inspection, contact the relevant users to confirm the operation of the remote water meter or flowmeter. If the abnormal situation can be dealt with on the spot, it shall be dealt with promptly; if it cannot be handled on the spot, contact relevant personnel of Engineering Technology Section to report the situation on site and the Engineering Technology Section shall be responsible for handling.

V. Fill in the work contact list, including the time of abnormality, the time of abnormality, the time to the site, the situation on site, and suggestions, and report it to the branch leader, engineering technology department, water supply supervision department and its branch office, and file it at the same time.

6. Regarding the abnormal situation that could not be dealt with on the spot, the branch office follows the progress of the engineering technology department and actively supports and cooperates with it. After the treatment is completed, the operation status of the remote water meter or flow meter is confirmed at the site.

VII. Intensify daily monitoring of remote water meters or flow meters that have experienced abnormalities and focus on them.

With the continuous improvement of urban and rural water supply integrated management, the regional metrology work of Xiaoshan Water Division has also been fully implemented. However, routine management of large-diameter remote water meters and flowmeters can detect abnormal traffic conditions in time and solve measurement problems. In the bud.